The awarded contract encompasses a comprehensive package of utility shifting of electrical utility work critical to clearing the Right of Way (RoW) for the Namo Bharat corridor between Bhalswa and Narela. The work includes shifting and modification of high-voltage 33kV and 11kV lines, along with Low Tension (LT) distribution infrastructure managed by TPDDL, which currently infringes upon the proposed corridorfrom sarai Kale Khan to karnal alignment.
In